October 15, 2009
In
Blog, Uncategorized
Fernbank work in progress
Here’s some photos of this project under construction, these photos show the second panel, the hooped design, under way.
So far 2 panels are made with a further 7 to go. Bending 40×10 stainless on edge for the first panel design proved a little tricky but in the end we prevailed with superior fire power!
- Working from a full size drawing to make the components…..
- forged hoops having the wrap detail applied
- Bending forged components under the fly press…..